A new system here will heat from October through April and cool from June through September every year. Tell us about the house, and a licensed contractor who covers Hudson County will get in touch.
Tell us about the job
It takes about a minute.
Eleven months of the year, your system is running
Jersey City only gets a real break from heating and cooling for about a month. Furnaces run October through April, seven months, with winter nights averaging 28°F. Then the AC takes over June through September, with afternoons averaging 84°F. A new system here needs to handle both ends without much rest in between.
Almost two thirds of homes in the area heat with gas, so a furnace or a gas-fired system is what most installers are sizing and venting for. Storms are part of the picture too. Hudson County has logged 16 winter storms and 35 damaging wind events over the past ten years, and 11% of New Jersey households lost power for at least a day in 2024. Whatever gets installed has to start back up reliably after an outage, not just run well on a clear day.
- 7 months
- October through April, your system heats
- 4 months
- June through September, it cools
- 28°F
- the average winter night it heats against
- 84°F
- the average summer afternoon it cools against

NOAA nClimDiv, 1991–2020 normals
New Jersey requires HVAC contractors to hold a state license.
The state board tests contractors before it licenses them, and the license belongs to the contractor, not to any single job, so the same license covers this installation as everything else that contractor takes on. New Jersey handles this at the state level, not the local one. Cities and towns in Hudson County cannot require their own separate HVAC license on top of it.
For a heating and cooling installation, that state license is what stands behind the person doing the work. The job itself also needs a permit from the local building office, and an inspection once the work is done, since that is how most cities and counties handle a furnace, air conditioner or heat pump replacement. The permit and inspection are separate from the license. They are the local check that the finished installation was done right, not a second credential for the contractor.
Sources: New Jersey Legislature · New Jersey Division of Consumer Affairs
- When should I replace my HVAC system?
- Replace it when repairs start happening every year, when the system struggles to keep the house even on the coldest nights or hottest afternoons, or when a contractor tells you the repair costs more than a new system justifies. Winters here run cold enough, down to 28°F on average, that a weak furnace shows itself fast. If your bills keep climbing while the house stays uneven, that's usually the system losing efficiency, not the thermostat. A contractor can look at the specific unit and tell you whether what you're seeing is a repair or the system telling you it's done.
- Should I replace my furnace and air conditioner at the same time?
- If they're close in age, yes, it usually makes sense to do both together. A furnace and air conditioner installed years apart often don't match well, since the coil and blower are sized to work with a specific unit on the other end. Replacing one but not the other can mean the new equipment never runs at its rated efficiency. If one system still has years of life left in it, a contractor can tell you whether it's worth pairing now or waiting.
- What happens during an HVAC installation?
- A contractor removes the old furnace, air conditioner or heat pump, then sets the new equipment in place and connects it to the ducts, the electrical, and either the gas line or the refrigerant lines depending on what's going in. They check the ductwork for leaks or sizing problems, since a new system tied to bad ducts won't perform right. Once it's running, they test it and set the controls. Because this is a full system replacement, it needs a permit from the local building office and an inspection once the work is done.